Home › Guides › Buying a Minneapolis House With TISH Repairs

Buying a Minneapolis House With TISH Repairs: What You're Agreeing To

You've found a house in Minneapolis, the price looks good, and the Truth in Sale of Housing report has a list of required repairs. The seller says, "You can take them on, that's why it's priced this way." Before you agree, it helps to know exactly what the city expects from you after closing, because the clock starts the day you get the keys.

This guide sticks to what the City of Minneapolis publishes on its own TISH pages, read on November 23, 2026 (the pages say they were last updated June 30, 2026). We buy, renovate and sell houses in the Twin Cities, so we deal with TISH reports on both sides of a sale. We aren't attorneys, lenders or a city office. Confirm anything that affects your purchase with Minneapolis Truth in Housing, your title company or a real estate attorney.

What a Minneapolis TISH report is

Minneapolis requires a Truth in Sale of Housing evaluation before you sell a single-family house, a duplex, a townhouse or a first-time condominium conversion. The city says you must have a full report "before you can show a property," and the seller must display a copy at showings (City of Minneapolis, TISH).

The evaluation is done by a private evaluator licensed by the city, not a city employee. The report lists items that need repair, if any, includes a checklist of required repairs, and is valid for two years or one sale (City of Minneapolis, TISH evaluations).

Two kinds of property don't need a report: one with a Certificate of Code Compliance (issued after a property is brought out of condemnation, good for up to a year) and newly built homes with a Certificate of Occupancy (good for one sale).

It isn't a home inspection. The TISH checklist is set by the city and covers specific items. It doesn't tell you whether the roof has five years left or whether the basement leaks in April. Hire your own inspector either way.

Who makes the repairs: seller or buyer?

The seller can fix the required items before closing. If they do and the work passes, the city issues a Certificate of Approval online, and you have nothing to sign for TISH.

If the required repairs are not finished before closing, the city's evaluation page says the buyer must:

  1. Sign an acknowledgment of responsibility.
  2. Submit it to the city right after closing. The acknowledgment page says "within one business day of the closing"; the seller and the buyer both sign it at closing (City of Minneapolis, acknowledgement of responsibility).
  3. Complete the required repairs within 90 days of closing.

In other words, taking on the repairs isn't a handshake between you and the seller. It's a written promise to the city, with a deadline.

The 90-day deadline and reinspections

The city's reinspection page puts it plainly: the buyer has 90 days from the date of closing "to complete the required repairs and get them reinspected" (City of Minneapolis, reinspections). Finished isn't enough. The work has to pass.

Who you call depends on the repair:

After a successful reinspection, the city issues a Certificate of Completion online. You can look it up by address.

If 90 days won't be enough, the city has an extension request application on the reinspection page. It doesn't say how long an extension lasts or how one is decided, so ask early rather than in week twelve.

What it costs beyond the repairs

The repair itself is only part of the bill. From the city's reinspection page:

Get written quotes from contractors before you sign the purchase agreement, not after closing. A list that reads like "repair handrail, replace water heater vent, add GFCI outlets" can be a weekend and a few hundred dollars, or it can turn into a permit job once a contractor opens a wall.

Questions to settle before you agree

When taking on the repairs is the wrong choice

Be honest with yourself. Skip the deal, or ask the seller to finish the work, if:

A house where the seller has already finished the TISH repairs, or a renovated home where the work was permitted and signed off, can cost more up front and still be the cheaper move.

Buying in St. Paul instead?

St. Paul's program works differently. Its TISH report is a disclosure the seller gives you. Apart from a smoke-alarm requirement, it isn't a list of repairs someone must finish on a 90-day clock. Our St. Paul TISH guide for buyers explains how to read it. If the house has been flipped, also read what to check before buying a flipped house: permits, contractors and what was actually replaced.

Quick checklist

If you'd rather buy a home where the work is already done, see our buyer page, or call 952-245-2570 about a house we're selling. We can't give legal or lending advice.

More guides

See all guides

Questions About a House?

Call us and we'll answer what we can, honestly.

No answer? Call or text the owner's cell: (952) 393-0995